- Home
- Permits
Permits for modular homes in Europe
In every European country a permanent modular home is treated like any other building: it needs the right permit and has to meet local building and energy rules. Your architect or builder obtains approval; we supply the specifications they need.
Choose your country
Each country page explains the local permit, energy rules and finance options in your language.
| Country | Permit you'll need | Who usually applies | Energy rules | |
|---|---|---|---|---|
| Germany | Baugenehmigung (building permit) via a Bauantrag | An architect or engineer entitled to submit plans (bauvorlageberechtigt) | Gebäudeenergiegesetz (GEG) | Deutsch → |
| France | Permis de construire (déclaration préalable for some small extensions/annexes) | You or your builder; an architect is mandatory above 150 m² floor area | RE2020 | Français → |
| Spain | Licencia de obras (licencia urbanística) | A licensed architect who signs the proyecto | Código Técnico de la Edificación (CTE) | Español → |
| Italy | Permesso di costruire | A qualified designer (architetto, ingegnere or geometra) | National energy-efficiency rules; NTC 2018 for structure and seismic design | Italiano → |
| Netherlands | Omgevingsvergunning (environmental permit) under the Omgevingswet | You, your architect or builder | BENG requirements in the Besluit bouwwerken leefomgeving (Bbl) | Nederlands → |
| Portugal | Licenciamento or comunicação prévia under the RJUE | A licensed architect who signs the architecture project | Sistema de Certificação Energética (SCE) | Português → |
| Poland | Pozwolenie na budowę or zgłoszenie (notification) for some single-family homes | A licensed architect; a site manager (kierownik budowy) is usually required | Warunki Techniczne (WT 2021) | Polski → |
| Czech Republic | Povolení stavby under the Building Act (stavební zákon) | An authorised designer (autorizovaný projektant) | Energy performance requirements for buildings (zákon o hospodaření energií) | Čeština → |
| Romania | Autorizație de construire, after a certificat de urbanism | An architect with signing rights (drept de semnătură) | Energy performance rules for buildings (Law 372/2005) | Română → |
The usual steps
Check the zoning
Confirm with your municipality what may be built on your plot — height, footprint, distance from boundaries and use.
Appoint a local professional
An architect or engineer prepares the application, using the specifications we provide for your Capsul.
Apply for the permit
The application is lodged with the local authority, which may consult neighbours or other bodies.
Foundation and installation
Once approved, your builder prepares the site and your home is shipped, placed and connected.
Final sign-off
The authority or an inspector confirms the building matches the approval before it is occupied.
Garden annexes and small buildings
Many countries have a simpler procedure — or none — for small secondary buildings. Conditions are strict and usually depend on size, height, location and whether people will live in it. Never assume an exemption: ask your municipality.
How Capsul helps
- Technical specification pack and drawings for each model
- Structural and material information for your engineer
- Insulation and glazing details for energy calculations
- Direct contact with your architect or builder
Let's talk about your project
Tell us about your plot and what you have in mind. We'll come back within one business day with honest advice and a clear price.
Thank you — we've got it.
We'll reply within one business day. If it's urgent, call or email us directly.