1. Home
  2. Permits
Permit guide

Permits for modular homes in Europe

In every European country a permanent modular home is treated like any other building: it needs the right permit and has to meet local building and energy rules. Your architect or builder obtains approval; we supply the specifications they need.

Choose your country

Each country page explains the local permit, energy rules and finance options in your language.

CountryPermit you'll needWho usually appliesEnergy rules
GermanyBaugenehmigung (building permit) via a BauantragAn architect or engineer entitled to submit plans (bauvorlageberechtigt)Gebäudeenergiegesetz (GEG)Deutsch →
FrancePermis de construire (déclaration préalable for some small extensions/annexes)You or your builder; an architect is mandatory above 150 m² floor areaRE2020Français →
SpainLicencia de obras (licencia urbanística)A licensed architect who signs the proyectoCódigo Técnico de la Edificación (CTE)Español →
ItalyPermesso di costruireA qualified designer (architetto, ingegnere or geometra)National energy-efficiency rules; NTC 2018 for structure and seismic designItaliano →
NetherlandsOmgevingsvergunning (environmental permit) under the OmgevingswetYou, your architect or builderBENG requirements in the Besluit bouwwerken leefomgeving (Bbl)Nederlands →
PortugalLicenciamento or comunicação prévia under the RJUEA licensed architect who signs the architecture projectSistema de Certificação Energética (SCE)Português →
PolandPozwolenie na budowę or zgłoszenie (notification) for some single-family homesA licensed architect; a site manager (kierownik budowy) is usually requiredWarunki Techniczne (WT 2021)Polski →
Czech RepublicPovolení stavby under the Building Act (stavební zákon)An authorised designer (autorizovaný projektant)Energy performance requirements for buildings (zákon o hospodaření energií)Čeština →
RomaniaAutorizație de construire, after a certificat de urbanismAn architect with signing rights (drept de semnătură)Energy performance rules for buildings (Law 372/2005)Română →

The usual steps

  1. Check the zoning

    Confirm with your municipality what may be built on your plot — height, footprint, distance from boundaries and use.

  2. Appoint a local professional

    An architect or engineer prepares the application, using the specifications we provide for your Capsul.

  3. Apply for the permit

    The application is lodged with the local authority, which may consult neighbours or other bodies.

  4. Foundation and installation

    Once approved, your builder prepares the site and your home is shipped, placed and connected.

  5. Final sign-off

    The authority or an inspector confirms the building matches the approval before it is occupied.

Garden annexes and small buildings

Many countries have a simpler procedure — or none — for small secondary buildings. Conditions are strict and usually depend on size, height, location and whether people will live in it. Never assume an exemption: ask your municipality.

How Capsul helps

  • Technical specification pack and drawings for each model
  • Structural and material information for your engineer
  • Insulation and glazing details for energy calculations
  • Direct contact with your architect or builder
This guide is general information, not legal advice. Rules differ between regions and municipalities and change over time. Your architect, builder or local authority will confirm what applies to your plot.
Get a free quote

Let's talk about your project

Tell us about your plot and what you have in mind. We'll come back within one business day with honest advice and a clear price.

We reply within one business day.

Thank you — we've got it.

We'll reply within one business day. If it's urgent, call or email us directly.

PhoneGet a free quote